Sabtu, 24 Desember 2011

Cascada Last Christmas



SEPCo inc. wishes for all of you,

HAPPY MERRY CHRISTMAS

AND

HAPPY NEW YEAR EVE 2012

May this Christmas night are special for around the world with peaceful and harmony,
give the heart from Indonesia for entire world..

Senin, 11 April 2011

Photographic memorials on PT Tuberki Steam Coal Mining Station GCV 72.00 Kcal/Kg. Mining Oriented Resources.

Our Mineral is on Nunukan, East Kalimantan. Indonesia. this location is very strategic for asia forwarder from / to all around the world carriage. 
this photographic memorials PT Tuberki Steam Coal Mining Station has been leased or sale.

Watch it closer, our steam coal is very natural and is in productivity for all usage industrials. 

if you had want this mining station, pleased looks infos on under this quotes. 

Kamis, 07 April 2011

-SEPCo inc.-

Welcome to SEPCo,inc. Official site of the steam coal mining station on Indonesia and United States.
PT. Grace Manunggal - PT. Tuberki at east kalimantan,indonesia. Needed investors for develop and resource of steam coal mining station. Plead to seeing more closer to the under messages. We can make sure this is the officially messages.
Thank you so much to visit our official site of SupremEnergies - Plantation Corporation,inc.

Maurice Duncan Kusuma
Author

Senin, 28 Maret 2011

- Commercialounge | Export inc -

Commercialounge | Export inc.


FOR SALE / FOR INVESTOR LEADING INTEREST ON STEAM STATION COAL MINING AND MINING RESOURCES


PT Tuberki is the Landlord of coal mining in the area of ​​Nunukan, East Kalimantan, Indonesia.
Land Area at: 2,008 Hectares
with an estimated stock of coal for the content of GCV of 70.00 Kcal / Kgs (orientation survey conducted by the PT Lippo Group, PT. as many as 9 points points)
Total stock of calories in the amount of five million Metric Tons
for Certification of Land has been available for further study. and for certification of production to wait or not yet available.

Selling Offers Price: IDR 260 billion, - (in words # Two Hundred Sixty Billion Indonesian Rupiahs #) or USD 29,720,000.00 (in words # Twenty-Nine Million Seven Hundred and TwentyThousand United State Dollars #) not including VAT and Income Tax registered within the legal territory of the Republic of Indonesia.


or

Value of Production Co-operation offered by:
- Cash Advance payment: IDR 65 billion, - (in words # Sixty-Five Billion Indonesian Rupiahs

#) or USD 7,428,571.50 (in words # Seven Million and Four Hundred Twenty-Eight

Thousand Five Hundred Seventy One point fifty cents United State Dollars #) - in

percentage by 25%


- 2nd Cash Payment: IDR 156 billion, - (in words # One Hundred Fifty-Six Billion Indonesian

Rupiahs #) or USD 17,828,571.50 (In words # Seven Million and Eight Hundred Twenty

Eight Thousand Five Hundred Seventy One Fifty coma Fifty United State Dollars #) - in

percentage of 60%


- Final Cash Payment:IDR 39 billion, - (in words # The Thirty-Nine Billion Indonesian Rupiahs #) or USD 4,462,857.00 (in words # Four Million and Four Hundred Sixty-Two Thousand

Eight Seven Hundred Fifty United State Dollars #) - in percentage 15%


or

By offering payment system with security Buyback Agreement of Understanding Letters and manufacture of Performance Bonds IDR 20,000,000,000, - (in words # Two Twenty BillionIndonesian Rupiahs # ) or the amount of USD 2,000,000.00 (in words # Two Million UnitedState Dollars #)

This system is a production-sharing was calculated according to the operational and management as follows;

- Full Set System Operational and Minerals will be divided by the largest revenue 60% with the

condition, as follows:

a. Provide and operate the equipment - heavy equipment and transportation means that will
required to process the coal mine land into processed materials that are ready selling.

b. All Production or Operating Costs are the responsibility of Party Operationally, if there is an

order that specified in the quota that has been done.


- Landowner and Merchant House will be divided by the smallest income by 40% with conditions,

as follows:

a. Provide office and other needs and implement management and sell the mine in accordance

with the quota.

b. Provide and manage existing resources during the process of contract occurred.


note: this description, an outline of this offering. please understand and can be changed in

accordance with the provisions to be set later.


Divider results fellowship to PT Grace Manunggal as Broker / lobbying, defined as follows;

- for selling the system for cash payee IDR 10,000,000,000.00 (in words #Ten Billion

Indonesian Rupiahs #) or USD 1,142,855.00 (in words # One Million and Hundred Forty

Two Thousand Eight Hundred Fifty Five United State Dollars #)


- for the Co-Operational system IDR 10,000,000,000.00 (in words # Ten Billion Indonesian

Rupiahs #) or USD 1,142,855.00 (in words # One Million and One Hundred Forty-Two

Thousand Eight Hundred Fifty Five United State Dollars #) paid divider in accordance with predetermined phase

- for the Buyback system for USD 2:00 (in words # Two United State Dollars #) per Metric

Tons according to the contract sales quotas.


This offer is valid until April 30, 2011 and open to the public, we do not serve the agent or broker on behalf of PT and PT Grace Manunggal Tuberki. and this offer is valid on the official blogsite which has been listed as collateral for this cooperation. The following is the official name of the blogsite;

- http://thecoalbanks.blogspot.com/

- http://commerceighthc.blogspot.com/

- http://sublandscorporation.blogspot.com/

- http://sepcomining.blogspot.com/

- http://subentamacor.blogspot.com/

- http://sepco-ptgm.blogspot.com/

- http://exportinc.blogspot.com/

- http://ptgracemanunggal.blogspot.com